You can download hereafter the general schedule at a glance of the conference (as of December 23rd, 2025).
You can now explore below the selected abstracts.
Tutorial 1: Development of a Sound Analysis Tool for Pre-Diagnosis of Mechanical Failure
Tutorial 2: Hazardous Area Classification
Operational Sharing 01: Control Scheme Strategies for SEU-Induced Protection Relay Failures
Operational Sharing 02: Strategic HV Cable Management in Petrochemical and Refining plants
Operational Sharing 03: Life Cycle Management of Electric Machines
Operational Sharing 04: 34.5-kV Underground Cable Failure – Case Study
Paper 01: Electrification of Process Heat from technologies to large scale implementation
Paper 02: The Energy Paradox of Artificial Intelligence: balancing production vs demand
Paper 03: Design of a reactive power compensation scheme for AC offshore wind power system
Paper 04: Electrical Monitoring and control systems (EMCS) IOGP Recommended Practice
Paper 05: Ultra-Compact Permanent Magnet Motor for Oil & Gas Production Applications
Paper 06: Co-Simulation: Unlocking Advanced Approaches to Electrical incident Analysis
Paper 07: Investigations about self-excitation for large induction motor
Paper 08: Performance Drift Detection & Decision Framework: Redesign vs Process Fix
Paper 09: Switching Events and Ferroresonance: Field Experience and Solutions
Paper 10: Applying Mature Digital Twin to Optimize Production and Reduce Carbon Footprint
Paper 11: Operational Strategies for a Multi-Source 66 kV Network: Design & Implementation
Paper 12: SF6-Free regulations from 2026 on the MV Switichgears
Paper 13: Protection Challenges for Delay Zero Crossing
Paper 14: Enhancing Procurement Efficiency Through IOGP JIP33 Electrical
Standardization
Paper 15: Active and Passive Magnetic Bearings for Large Variable Speed Motors
Paper 16: Point-on-wave vs Pre Insertion Resistor techniques in capacitor bank
switching
Paper 17: Ormen Lange Phase 3: A record-breaking subsea compression system
Paper 18: Turning Maintenance Reports into Actionable Risk and Work Orders with LLMs
Paper 19: Build and optimize the electrical architecture of a 600MW H2 Electrolyzer plant
Paper 20: Optimisation of operating sequence of electrolyser units for hydrogen production